POWRA and overhead lines: lessons from an HSE case study.

An HSE prosecution shows why a useful POWRA conversation needs to connect the actual work, equipment, overhead lines, contractor arrangements and supervision.

This is a learning example, not a claim that a form would have prevented a death.

The HSE’s findings identify wider planning and management failures. A point-of-work check can prompt questions; it cannot prove that a method or control is safe.

What happened?

At a biogas site in Devon, contractors were carrying out work involving a biodigester. A mobile elevating work platform (cherry picker) struck an 11,000-volt overhead line. One worker died and a colleague suffered life-changing injuries.

HSE reported that the site operator had not adequately managed, planned and supervised contractors working near or under energised lines. HSE also found the contractor’s risk assessment was not suitable and sufficient, and that formal training and supervision were inadequate. Two companies were sentenced in March 2026 for the case arising from the 2020 incident. Read the HSE prosecution report.

A POINT-OF-WORK CONVERSATION

What should the team be able to answer?

  1. Where are the overhead lines? Include the work area and any access route. Do not guess what a line carries from how it looks; confirm its status with the owner or network operator.
  2. What is the exact task and equipment? Consider the equipment’s full working range and movement, not just its parked position. A still photo or app cannot determine safe clearance.
  3. Who could be exposed? Include the operator, workers nearby, the support crew and people affected by the contractor interface.
  4. Who has planned and verified the arrangements? Make sure competent people have agreed how the work will be controlled and that the team understands its part before starting.
  5. What happens if something is unknown or changes? Hold the affected work and refer the question to the responsible supervisor and competent person. Do not invent a distance or improvise a control.

What might a weak and a useful record say?

Too vague to guide the job

“Watch for cables.”

That does not say which lines, where they are, whether the task or equipment could approach them, who confirmed the arrangements, or what the crew should do if unsure.

Specific enough to prompt a check

“Confirm the line location and status with the owner; check the planned MEWP task and working range against the competent work plan; brief the operator and affected crew. Hold if any detail or control is unconfirmed.”

This is an example of useful detail, not a complete work plan or prescribed set of controls.

HSE guidance says to find out whether overhead lines are within, beside or across access routes to the work area, assume they are live unless their owners prove otherwise, and consult the owner when lines are near planned work. The appropriate controls depend on the circumstances and competent advice. Read HSE guidance on overhead power lines.

A POWRA should sharpen the wider safety conversation

A poor or generic POWRA is a reason to ask more about the RAMS, the construction phase plan, contractor coordination, competence and supervision. It does not, by itself, prove those wider arrangements are deficient. Check the plan and the work taking place.

Some risks require decisions before the crew reaches the workface. A POWRA supports communication and review at the point of work; it does not replace formal risk assessment, method statements, permit arrangements, utility-owner advice or competent supervision. If a life-threatening hazard is present or controls are uncertain, stop the affected work and follow the site’s established process.

HSE specifically warns that overhead lines on wooden poles should not be mistaken for telephone wires. A photo suggestion can draw attention to something; it cannot identify the service or verify its status. See when a changing task should trigger another review, or compare good and weak POWRA examples.